Welcome to ESH Trace Heating Ltd's project list for 2015.
Friday, 2 January 2015
Toyota Motor Manufacturing, Derby
Within the Toyota weld shop, ESH supplied and install a trace heating system to perform the duty of temperature maintenance. The internal metal pipework was required to maintain a temperature of +30°C.
No comments:
Post a Comment