2015 Project List
Welcome to ESH Trace Heating Ltd's project list for 2015.
Showing posts with label
Derby
.
Show all posts
Showing posts with label
Derby
.
Show all posts
Friday, 2 January 2015
Toyota Motor Manufacturing, Derby
Within the Toyota weld shop, ESH supplied and install a trace heating system to perform the duty of temperature maintenance. The internal metal pipework was required to maintain a temperature of +30
°
C.
*
Process Temperature Maintenance Trace Heating
*
Home
Subscribe to:
Posts (Atom)