Monday, 2 February 2015

Heinz, Telford


A saucey project right on the door step of ESH HQ. For this local job we were contracted to design, supply and install two trace heating systems to temperature maintain both a Glucose line at +40°C and a Caustic line at +20°C. Type VCBOJ constant wattage heating tape was straight traced onto both sets of pipework and temperature controlled using DTC digital thermostats.

No comments:

Post a Comment