Showing posts with label Telford. Show all posts
Showing posts with label Telford. Show all posts
Wednesday, 6 May 2015
Lakeside Academy, Telford
Within this new Academy in Telford, ESH supplied and installed a frost protection trace heating system to the external LTHW pipework associated with six air handling unit's. Constant wattage heating cable type VC was used throughout this project.
Monday, 20 April 2015
Telford Co-Operative Academy
Monday, 2 February 2015
Heinz, Telford
A saucey project right on the door step of ESH HQ. For this local job we were contracted to design, supply and install two trace heating systems to temperature maintain both a Glucose line at +40°C and a Caustic line at +20°C. Type VCBOJ constant wattage heating tape was straight traced onto both sets of pipework and temperature controlled using DTC digital thermostats.
Subscribe to:
Posts (Atom)

