350 metres of H2OWAT65 self regulating heating cable was supplied and installed in order to provide hot water temperature maintenance to the schools HWS pipework.
Showing posts with label Education Facility. Show all posts
Showing posts with label Education Facility. Show all posts
Wednesday, 13 May 2015
Wednesday, 6 May 2015
Lakeside Academy, Telford
Within this new Academy in Telford, ESH supplied and installed a frost protection trace heating system to the external LTHW pipework associated with six air handling unit's. Constant wattage heating cable type VC was used throughout this project.
Friday, 1 May 2015
Roberts Building, Torrington Place, London
Monday, 20 April 2015
Telford Co-Operative Academy
Thursday, 5 March 2015
Orley Farm School, Harrow
ESH supplied and installed a trace heating system to provide frost protection to two runs of BCWS pipework. Type VCBOJ constant wattage heating cable was installed onto the external metal pipes and controlled using STCI thermostats.
Monday, 12 January 2015
ESRI Building, Swansea University
The Energy Safety Research Institute (ESRI) is a brand new 3800sqm building on Swansea's Bay Campus. ESH designed, supplied and installed a frost protection trace heating system to over 600 metres of external pipework on the buildings roof area. Pipework, which comprised of BCW, LTHW and CHW pipes up to 100mm NB, was straight traced using our constant wattage heating tape type VCBOJ.Monday, 5 January 2015
Downside Abbey Library, Radstock

The Abbey library is the largest private library in the South West of England and holds one of the largest collections of research material in the UK. Within this fabulous building, ESH supplied and installed a frost protection trace heating system to the external pipework in the basement area. The pipework comprised of LTHW, CHW and sump-pump pipework up to 50mm NB. Two buffer vessels approximately 1.8m tall were also frost protected.
Subscribe to:
Posts (Atom)

