Part of this massive £500m station redevelopment project, started in 2013 and completed in 2018, ESH were contracted to design, supply and install a frost protection trace heating system to internal steel sprinkler pipework. The dual circuit system complete with change-over monitoring controllers was designed to maintain the pipework at +5°C in an ambient of -15°C.
Just under 2000 metres of type VCBOJ constant wattage heating cable was supplied and installed during this project.
Part of the UCL Department of Mechanical Engineering this brand new laboratory is in the heart of London. Here ESH designed, supplied and installed trace heating to provide frost protection to the CHW and LTHW pipework. In total over 250 metres of type VCBOJ constant wattage heating cable was installed by our engineers.
Part two of this large trace heating project, saw ESH supply, design and install a trace heating system to frost protect the chilled water and basic cold water pipework on top of the office roof. The system was designed to use our type VC constant wattage heating cable, of which, over 600 metres was installed during the first part of the project.
Rackspace is a world leader in cloud computing and hosting and 5 Hyde Park is the home of their UK headquarters.
ESH were contracted to repair four runs of frost protection heating tape originally installed by others, on two chilled water pipes and two heating pipes.
This was ESH's first project here at Rackspace's ultra modern UK headquarters. Part one, of this two part project, saw ESH design, supply and install a trace heating system to temperature maintain the internal hot water pipework at a minimum of +55ÂșC. Type H2OWAT55 self regulating heating cable was installed throughout to achieved the required temperature.
ESH carried out repair work to an existing JBTR1 thermostat plus supplied and installed an additional run of type VCBOJ constant wattage heating cable to the CHW pipework.