Friday, 27 March 2015

Penrith WWTW

For this waste water treatment project, ESH designed, supplied and installed over 600 metres of self regulating trace heating cable. The site requirement was to frost protect the external ABS pipework at +5°C in a minimum ambient temperature of -20°C. Type FBT heating cable was used throughout this project.

No comments:

Post a Comment