Flocktons, Grimsby (Storage Tank 1)
ESH were contracted to design, supply and install a frost protection trace heating system to a large storage tank, 3.5m dia x 6.5m high. In total over 220 metres of type FBT self regulating heating cable was installed to achieve the required heat loss replacement.
No comments:
Post a Comment