Part of this massive £500m station redevelopment project, started in 2013 and completed in 2018, ESH were contracted to design, supply and install a frost protection trace heating system to internal steel sprinkler pipework. The dual circuit system complete with change-over monitoring controllers was designed to maintain the pipework at +5°C in an ambient of -15°C.
Just under 2000 metres of type VCBOJ constant wattage heating cable was supplied and installed during this project.
Thursday, 21 May 2015
Wednesday, 13 May 2015
Hatcham Temple Grove Free School, London
350 metres of H2OWAT65 self regulating heating cable was supplied and installed in order to provide hot water temperature maintenance to the schools HWS pipework.
Wednesday, 6 May 2015
Lakeside Academy, Telford
Within this new Academy in Telford, ESH supplied and installed a frost protection trace heating system to the external LTHW pipework associated with six air handling unit's. Constant wattage heating cable type VC was used throughout this project.
Friday, 1 May 2015
Roberts Building, Torrington Place, London
Subscribe to:
Posts (Atom)