Tuesday, 20 January 2015
Cambrian Centre, Newport
ESH carried out repair work to an existing JBTR1 thermostat plus supplied and installed an additional run of type VCBOJ constant wattage heating cable to the CHW pipework.
Monday, 19 January 2015
Tophill Low WWTW
ESH supplied and installed FBTBOJ self regulating heating cable in order to frost protect 1" and 2" plastic pipework at +5°C in a minimum ambient temperature of -20°C.
Tuesday, 13 January 2015
New SEM Headquarters, Dartford
Monday, 12 January 2015
ESRI Building, Swansea University

Monday, 5 January 2015
Downside Abbey Library, Radstock

The Abbey library is the largest private library in the South West of England and holds one of the largest collections of research material in the UK. Within this fabulous building, ESH supplied and installed a frost protection trace heating system to the external pipework in the basement area. The pipework comprised of LTHW, CHW and sump-pump pipework up to 50mm NB. Two buffer vessels approximately 1.8m tall were also frost protected.
Friday, 2 January 2015
Toyota Motor Manufacturing, Derby
Within the Toyota weld shop, ESH supplied and install a trace heating system to perform the duty of temperature maintenance. The internal metal pipework was required to maintain a temperature of +30°C.