Tuesday, 28 April 2015
Twickenham Stadium, London
ESH were contracted to test and de-commission an existing trace heating system installed by others.
Monday, 20 April 2015
Telford Co-Operative Academy
Monday, 13 April 2015
Robinson Brothers Ltd, West Bromwich
ESH supplied and installed both the trace heating and thermal insulation to provide temperature maintenance to stainless steel pipework within a Zone I hazardous area. The pipe required to maintain a temperature of +40°C. Our ATEX approved constant wattage heating cable, type SCBXT, was used throughout this project.
Friday, 10 April 2015
Flocktons, Grimsby (Storage Tank 2)
Tuesday, 7 April 2015
British Polythene Ltd, Widnes
Here for this leading manufacturer of polythene products, ESH designed, supplied and installed a high temperature maintenance trace heating system. The process plant pipework and equipment required maintaining at a minimum temperature of +80°C to allow for smooth and efficient running.
Thursday, 2 April 2015
Waitrose National Distribution Centre, Milton Keynes
Once finished, this giant building will become one of the UK's largest ever distribution centres constructed, covering a site of 45 acres. Here ESH supplied and install a trace heating system to provide frost protection to the external CHW and MCWS pipework. Type VC constant wattage heating cable was used throughout this project.